Western Branch Splitter Box

Role: Mechanical and Bypass Subcontractor

Com-Bro and it’s team of subcontractors installed 24” flowmeters and piping inside meter vaults and installed a 120 million gallon sewage bypass system to allow the General Contractor to complete critical pipe tie ins.

Location
Upper Marlboro, MD

Contract value
$700,000

Role
Subcontactor

Services

This work included installing 4000 linear feet of 18”, 30” and 42” HDPE pipe and twelve 18” diesel pumps, along with 24” flowmeters and DIP pipe.