Western Branch Splitter Box
Role: Mechanical and Bypass Subcontractor
Com-Bro and it’s team of subcontractors installed 24” flowmeters and piping inside meter vaults and installed a 120 million gallon sewage bypass system to allow the General Contractor to complete critical pipe tie ins.
Location
Upper Marlboro, MD
Contract value
$700,000
Role
Subcontactor
Services
This work included installing 4000 linear feet of 18”, 30” and 42” HDPE pipe and twelve 18” diesel pumps, along with 24” flowmeters and DIP pipe.